Practical Capacity
From ControllingWiki
Revision as of 15:11, 11 April 2012 by Dienstl-Arnegger (talk | contribs) (Undo revision 571 by 213.236.43.18 (talk))
Practical Capacity From ControllerWiki (unreviewed) Jump to: navigation, search
Practical Capacity - theoretical capacity adjusted for expected conditions: training of new hires, equipment downtime, vacations, and sick leave etc. It is usually calculated at about 80 to 85 percent of theoretical capacity.
Literature
Stenzel C., Stenzel J., Essentials of Cost Management
Author
Zieliński Tomasz