Difference between revisions of "Practical Capacity"
From ControllingWiki
Achtung. Sie nutzen eine nicht mehr unterstützte Version des Internet Explorer. Es kann zu Darstellungsfehlern kommen. Bitte ziehen Sie einen Wechsel zu einer neueren Version des Internet Explorer in Erwägung oder wechseln Sie zu einer freien Alternative wie Firefox.[unchecked revision] | [unchecked revision] |
(dzoHlhHEigP) |
(Undo revision 571 by 213.236.43.18 (talk)) |
||
Line 1: | Line 1: | ||
− | + | Practical Capacity | |
+ | From ControllerWiki | ||
+ | (unreviewed) | ||
+ | Jump to: navigation, search | ||
+ | |||
+ | Practical Capacity - theoretical capacity adjusted for expected conditions: training of new hires, equipment downtime, vacations, and sick leave etc. It is usually calculated at about 80 to 85 percent of theoretical capacity. | ||
+ | |||
+ | == Literature == | ||
+ | Stenzel C., Stenzel J., Essentials of Cost Management | ||
+ | |||
+ | == Author == | ||
+ | Zieliński Tomasz |
Revision as of 15:11, 11 April 2012
Practical Capacity From ControllerWiki (unreviewed) Jump to: navigation, search
Practical Capacity - theoretical capacity adjusted for expected conditions: training of new hires, equipment downtime, vacations, and sick leave etc. It is usually calculated at about 80 to 85 percent of theoretical capacity.
Literature
Stenzel C., Stenzel J., Essentials of Cost Management
Author
Zieliński Tomasz