Achtung. Sie nutzen eine nicht mehr unterstützte Version des Internet Explorer. Es kann zu Darstellungsfehlern kommen. Bitte ziehen Sie einen Wechsel zu einer neueren Version des Internet Explorer in Erwägung oder wechseln Sie zu einer freien Alternative wie Firefox.[unchecked revision] | [unchecked revision] |
(New page: Activity – work performed by people, equipment, technologies or facilities. Activities are usually described by the “action-verb-adjective-noun” grammar convention. Activities may oc...) |
|||
Line 1: | Line 1: | ||
− | Activity | + | Activity describes how much operating efficiency of a sector was used. As a rule this efficiency, which cannot be directly observed, is measured with the help of reference values. Provided that a unit of product is chosen as a reference value, the activity is the manufactured quantity of the product (in liters, items, reservations or similar). |
+ | There is a difference between a plan and an actual activity. The capacity indicates the maximal possible operating efficiency. Relating the actual activity to a comparative activity (planned activity, capacity) is the reason of an activity. | ||
− | == | + | == Source == |
− | + | ICV-Statement „Grundmodell für Kommunikations-Controlling“ | |
− | + | == Internet == | |
− | == | + | [ www.communicationcontrolling.de]www.communicationcontrolling.de |
− | + | == First version by == | |
+ | ICV work group "Kommunikations-Controlling", leader: Dr. Reimer Stobbe |
Revision as of 08:39, 17 October 2011
Activity describes how much operating efficiency of a sector was used. As a rule this efficiency, which cannot be directly observed, is measured with the help of reference values. Provided that a unit of product is chosen as a reference value, the activity is the manufactured quantity of the product (in liters, items, reservations or similar). There is a difference between a plan and an actual activity. The capacity indicates the maximal possible operating efficiency. Relating the actual activity to a comparative activity (planned activity, capacity) is the reason of an activity.
Source
ICV-Statement „Grundmodell für Kommunikations-Controlling“
Internet
[ www.communicationcontrolling.de]www.communicationcontrolling.de
First version by
ICV work group "Kommunikations-Controlling", leader: Dr. Reimer Stobbe